Serial No
|
Description of the job
|
Site
|
Client
|
Year
|
1
|
Salvaging (4) materials Barges (dead weight of each 100 tons)
"using floating crane"
|
Abu - Quir
|
Canal Harbour Co
|
1976
|
2
|
Inspecting and reporting the salvage plan the sunken cargo ship in "Tartous" Harbour
|
Tartous
Syria
|
Syrian Maritime CO.
|
1977
|
3
|
Re-floating sunken ship " Arwa " (dead weight 4200 tons)
using Hydrostatic forces
|
ADabia Harbour " at "Suez
|
Mr. H. EL- Fass
|
1977
|
4
|
Searching for 10 tons anchor, and lifting it from 46 meters depth
|
Sidi-Kerir of Alexandria
|
Arab Expert co.
|
1979
|
5
|
Up righting the capsized barge of cement factory " Silo1"
|
Alexandria Harbor
|
Bulk cement co
|
1980
|
6
|
Lifting 140 tons barge full of 360 tons cement bags after discharging cargo using floating crane
|
Alexandria Harbour
|
Private owner
|
1980
|
7
|
Lifting twin holes material pontoon used for "Ismailia Canal entrance
|
Ismailia
|
Arab contractors
|
1981
|
8
|
Lifting 80 tons lash barge full of weeds , using floating crane.
|
Alexandria Harbour
|
Prudential lines
|
1983
|
9
|
Joining "Smit - Tak salvage co. " in clearing the general cargo of the sunken M / V " Ingeleonhardt " , and refloating the ship ( cargo weight was 8000 tons of steel coils ),
|
Alexandria Harbour
|
Mesco co.
(Adm. Galal Fahmy)
|
1984
|
10
|
Lifting the sunken lash barge no. (94)
|
Alexandria Harbour
|
Mahoney co.
|
1985
|
11
|
Lifting the sunken lash barge no (64)
|
Alexandria Harbour
|
Mahoney co.
|
1985
|
12
|
Lifting the sunken mooring buoy at "Alexandria Harbor ", cleaning repairing and reinstalling it with anchors and chains,
|
Alexandria Harbor
|
Interlay co.
|
1985
|
13
|
Surveying and inspecting the two sunken vessels at "Swaken" , and putting the plan for lifting
|
"Sawaken Harbour " in " Republic of Sudan
|
Port Sudan
Port Authority
|
1986
|
14
|
Lifting the sunken lash barge (84)
|
Alexandria Harbour
|
Mahoney co.
|
1985
|
15
|
Lifting 400 tons steel bars ballets from sunken barge16 meters depth
|
Alexandria Harbour
|
Ottman co.
|
1986
|
16
|
Searching for a sunken lash barge no (645) ,which outside "Alexandria Harbour " , in unknown place holding 400 tons general cargo
|
Alexandria Harbour
Great Pass
|
Mahony Co.
|
1987
|
17
|
Lifting the cargo from the above lash barge using rubber pontoons with lifting capacity 10 tons each , the main cargo was consisting of VSA Armed Forces tanks each weight 10 tons " , and steel ballets each 11 meters length
|
Alexandrai Harbour
|
Mahoney Co.
|
1987
|
18
|
Lifting the above mentioned lash barge after being decreased to 100 tons weight, the salvage job was executed on two stages first stage outside the harbour by using heavy lift steel pontoon with lifting capacity of 200 tons, the job was done by lifting one end , other end was lifted by rubber pontoons , then towed inside the harbour ,second stage was done inside the harbor by using a floating crane of 150 tons lifting capacity
|
Alexandria Harbour
Max
Area
|
Mahoney Co.
|
1987
|
19
|
Lifting the sunken cargo ( 35 ton steel reinforcement ) & the sunken barge at Alexandria Harbour
|
Alexandrai Harbour
|
Ottman co.
|
1988
|
20
|
Floating the sunken Nile Cruise ( El - Salam ) at Cairo by clogging all the holes underwater level & decreasing the negative buoyancy by using the special lifting units(caramels) owned by ( The Nile Company for River transport )
|
Nile River Maadi
|
Private Owner
|
1988
|
21
|
Surveying and inspecting a sunken vessel & give the salvage recommendations to the client
|
in (Fanara) at "Suez Canal"
|
Private Owner
|
1990
|
22
|
Scrabbing the sunken vessels at "Port Tawific" on "Suez"by using the underwater electrical arch & lifting the parts after cutting
|
Port Tawfik" in "Suez
|
Tarek El -Hadad co. for import & export
|
1990
|
23
|
Surveying and reporting the plan and costs estimations ,several sunken vessels
|
Beirut Harbour
|
Medcom international
|
1993
|
24
|
Scrabbing the sunken passenger vessel "El-Salam", by splitting it to four parts ,and lifting by cranes
|
Suez waiting area
|
client Tartour co.
|
2003
|